Acton ADU
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
- Detached
- Ready-made plans
- Lists Mountain View on its own site
- No public complaints on its CSLB record
- Publishes general price ranges
Have a permitted ADU? Start with a remodel scope. Have a garage? Compare conversion with a new detached ADU before you choose a builder.
What the city allows, what it charges, and which licensed builders work here. Checked against the city's ADU pages on Oct 18, 2026.
Use these scoping questions before requesting quotes in Mountain View. Your designer and the city need to confirm the permit path for your parcel.
Start with the approved plans and permit history. List the rooms, fixtures and walls you want to change. Ask a remodeling contractor to separate finish work from structural, plumbing and electrical changes. Confirm the permit scope before work starts.
Mountain View ADU permit resourcesAsk a designer to assess the foundation, ceiling height, moisture and utility routes before pricing a dwelling conversion. Compare a quote that reuses the structure with one that replaces it. Use the Garage conversion filter below to find companies advertising this service.
Compare builders by ADU typeChoose a size and layout, then check the site plan and utility route. Compare custom construction with prefab installation on the same scope. Mountain View’s preapproved program is for detached new construction; confirm the site-specific work with the city.
Check the city’s preapproved programCheck the permit history before treating the work as a cosmetic remodel. Start with Mountain View’s legalize-existing-ADU resources and ask the city which review applies. Do not assume a renovation contract will resolve missing approvals.
City resources for an unpermitted ADURanked by a public score anyone can check: license, years licensed, ADU types and cities shown on their own sites, a local office, and published prices. Nobody pays to move up. Quote requests go to our team with the builder you picked. How we rank
These companies name Mountain View in their service areas. That is not proof of a completed local ADU or experience remodeling an occupied unit. Use the type filters to compare advertised services, then ask for a similar permitted project.
Directory records checked Oct 18, 2026. Use each builder’s service-area and CSLB links below to recheck the records before you hire.
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
Based in Santa Clara, Santa Clara County
CSLB #889458 active Class B Licensed 19 years
Based in Los Gatos, Santa Clara County
CSLB #1126603 active Class B Licensed 2 years
Based in Pleasanton, Alameda County
CSLB #1094866 active Class B Licensed 4 years
Based in San Jose, Santa Clara County
CSLB #1137392 active Class B Licensed 1 year
Based in San Jose, Santa Clara County
CSLB #1132916 active Class B Licensed 1 year
Based in Mill Valley, Marin County
CSLB #1117837 active Class B Licensed 2 years
8 Based in Santa Clara, Santa Clara County
CSLB #1104475 active Class B Licensed 3 years
Based in Redwood City, San Mateo County
CSLB #1119693 active Class B Licensed 2 years
Based in Beverly Hills, outside the Bay Area; serves Mountain View from there
CSLB #1160077 active Class B Licensed under a year
11 Based in Livermore, Alameda County
CSLB #1081083 active Class B Licensed 5 years
Based in San Jose, Santa Clara County
CSLB #1128719 active Class B Licensed 1 year
13 Based in Santa Clara, Santa Clara County
CSLB #1133829 active Class B Licensed 1 year
Match the contract name and license number to the current CSLB record. Ask for a Mountain View permit number and a reference for your project type. A garage conversion does not establish experience remodeling an occupied ADU.
Check the contractor on CSLBFor an ADU remodel or garage conversion, ask the bidder to identify retained walls, foundation repairs, moisture issues and utility upgrades. Put allowances for concealed damage in the quote. Do not assume reusing a building makes it cheaper.
Compare remodel, conversion and new buildFor a detached ADU, compare site-built and prefab bids with the same site work included. Ask who handles access, foundation, trenching, utility connections and permit corrections. Check a claimed preapproved plan against the city’s program.
See Mountain View’s preapproved plan programAsk each bidder to separate design, permits, demolition, site work, construction and exclusions. For an occupied ADU, include the work schedule and any temporary move. Compare construction separately from city, school and utility charges.
Review Mountain View ADU costs and feesDetached ADU, max size[1]
Attached ADU, max size[1]
Junior ADU (inside the house)[1]
Height[1]
Side and rear setbacks[1]
Units on a single-family lot[2][3]
| Building permit, new ADU (city's typical range) | $7,000 to $13,000[1] Based on a construction valuation of $100,000 to $300,000; includes inspections. Conversions run $3,000 to $5,000 and a JADU $4,000 to $6,000. |
|---|---|
| Excavation permit, if you need utility or sidewalk work | Up to $12,000[1] |
| Land use document fee | 0.24% of construction valuation[5] Collected on all projects at building permit. |
| Citywide transportation fee | $6,273.15 per new single-family unit[5][3] The city's page has no ADU line. State law: no impact fees under 750 sq ft; above that, a share in proportion to the main home. |
| Park land in-lieu fee | Based on land value: $160 to $210 per sq ft of land at low density[5][3] The page does not say how this applies to ADUs. State law bars it under 750 sq ft. |
| School fees | Mountain View Whisman $3.45, Los Altos SD $3.58, MVLA high school $1.72 per sq ft[6][1][7][8][9] For 500 sq ft or more. You pay the districts directly and show the receipt before the permit is issued. MVLA rises to $1.79 on Nov 13, 2026. |
| Water capacity fee (City of Mountain View) | $9,389.06 per single-family detached unit[5][3][1] No ADU line. State law limits capacity charges to a share based on the ADU's size or plumbing fixtures. Conversions that fix a code or zoning problem pay none unless new utility work is needed. |
| Sewer capacity fee (City of Mountain View) | $7,922.69 per single-family detached unit[5][3] No ADU line. The same state proportionality rule applies. |
You pay one elementary district (Mountain View Whisman or Los Altos) and the high school district (MVLA).[6]
The city encourages a preliminary review before detailed plans: 650-903-6306 or planning.division@mountainview.gov.[1]
Upload one PDF plan set with the Green Building worksheet, structural and energy calculations, and a title report or grant deed.[1]
Staff send the fee amount after prescreen. Review starts once you pay.[1]
Your contractor schedules inspections online. Final inspection grants occupancy.[1]
Review time: 2 weeks for each review round. The typical time to get a permit is 4 to 6 months.[1]
State deadline: State law gives the city 15 business days to say if your application is complete and 60 days to approve or deny a complete one.[3]
Apply at: ePermitsMV
Preapproved detached designs get a permit in about 30 days, with 7-business-day reviews, compared with 60 to 90 days for a standard ADU. Typical permit fees are the same $7,000 to $13,000.[11]
Who qualifies: New detached ADUs on single-family or multifamily lots. Only site, zoning and utility details are reviewed.
We could not read the designer list on the gallery site. You buy plans from the designer.
850 sq ft for a studio or 1 bedroom and 1,000 sq ft with 2 or more bedrooms. An attached ADU also can't exceed 50% of the main home. A junior ADU is up to 500 sq ft.[1]
Not for a studio. With 1 or more bedrooms you need 1 space, which can be in the driveway, unless an exemption applies, such as being within 1/2 mile of transit.[1][3]
The city says building permit fees for a new ADU typically run $7,000 to $13,000. An excavation permit can add up to $12,000, and school fees apply at 500 sq ft or more.[1]
Typically 4 to 6 months, in 2-week review rounds. A preapproved design takes about 30 days.[1][11]
28 ft for a one- or two-story ADU. A basement counts as a story.[1]
Every fact on this page links to one of these. We read each one on the date shown.