Skip to content
Bay Area ADU Builders

Building an ADU in Fremont, CA

Checked against the city's ADU pages on Oct 18, 2026.

Can I build one?
Yes, up to 1,200 sq ft A detached ADU can be 1,200 sq ft and 16 ft tall, 4 ft from side and rear lines. No parking required.[1][2]
What will the city charge?
9 fee lines The city doesn't publish a total for an ADU, so we list each charge. See every fee[3][2]
Who builds here?
10 licensed builders Each lists Fremont on its own site and holds an active CSLB license. See the list

Licensed ADU builders in Fremont

Ranked by a public score anyone can check: license, years licensed, ADU types and cities shown on their own sites, a local office, and published prices. Nobody pays to move up. Quote requests go to our team with the builder you picked. How we rank

What Fremont allows

  • Detached ADU, max size[1][2]

    1,200 sq ft of interior livable space
  • Attached ADU, max size[1][2]

    1,000 sq ft
  • Conversion of existing space[1][2]

    No size or height limit; up to 150 sq ft can be added for an entrance
  • Junior ADU (inside the house)[1][2]

    Up to 500 sq ft, inside the house or an attached garage
  • Height[1][2]

    Detached 16 ft (18 ft near major transit, +2 ft for a matching roof pitch); attached 30 ft or the zone limit, whichever is lower
  • Side and rear setbacks[1][2]

    4 ft side and rear; none for a conversion or a same-size replacement
  • Lot coverage[2]

    ADUs don't count toward lot coverage
  • Units on a single-family lot[1][2]

    1 ADU + 1 JADU (state rules also allow a conversion ADU + JADU + 1 detached ADU up to 800 sq ft)
  • Parking[1][2]

    None. No replacement parking if you convert or tear down a garage
  • Owner must live on site[1][2]

    No for an ADU; yes for a JADU that shares a bathroom with the house
  • Short-term rentals[2]

    Not allowed; rentals must be 30 days or longer
  • The building code generally calls for 10 ft between the main house and a detached ADU, and 5 ft to the fire separation lot line. Sprinklers or wall design can reduce this.[2]
  • Fire sprinklers are not required in the ADU if the main house doesn't need them.[2]
  • The ADU needs its own permit, separate from any work on the main house. Combined applications are rejected.[4]
  • If you have an unpermitted ADU built before Jan 1, 2020, Fremont's ADU Amnesty Program gives you up to 5 years without penalty to apply for a building permit, once health and safety issues are fixed.[5]
ADU rules in Fremont drawn on a typical lot Detached ADU, Fremont rules: up to 1,200 square feet, 4 feet from side and rear lot lines, 16 feet tall. Parking: None required. Rear lot line Street Main house ADU up to 1,200 sq ft 16 ft tall 4 ft 4 ft Parking: none required
Detached ADU, Fremont rules. Not to scale.

City fees for an ADU in Fremont

Fee lines for an ADU in Fremont
Building plan check and inspection (valuation table) $967.27 for the first $100,000 of valuation, plus $5.91 per extra $1,000 up to $500,000[3][6] Minimum valuation for a new wood-frame home (R-3, type VB) is $210.01 per sq ft. Add a $153 application fee, a 15% community planning fee and a 3% technology fee. Trade plan check on new construction is 25% of building plan check, $292 minimum per trade.
Ministerial design review (ADU/JADU, new) $2,000 deposit, billed at cost[3]
Plan review with a preapproved plan $1,000 flat[7] Construction and inspection fees still apply.
New address $278[3][2] Every ADU and JADU needs its own address.
Construction tax $3,137 per new single-family dwelling unit[3] The schedule has no ADU line. Ask the city whether it applies to your ADU.
City impact fees $0 at any size[2][8] Fremont says ADUs are not subject to its development impact fees, regardless of size.
School fees (Fremont Unified) $5.38 per sq ft over 500 sq ft[9] ADUs of 500 sq ft or less pay nothing. Above that, the whole square footage is charged.
Sewer capacity charge (Union Sanitary District) $6.46 per sq ft from Oct 1, 2026[10][11] Applies to detached ADUs and additions over 150 sq ft; none for an ADU inside existing living space. USD says this is not an impact fee, so the state exemption under 750 sq ft does not apply. It rises each year to $7.18 per sq ft in FY2032.
Water connection (Alameda County Water District) $11,093 per single-family dwelling unit[12][13] ACWD's schedule has no ADU line. State law says utility charges for an ADU must be in proportion to its size or plumbing fixtures, and an ADU inside existing space pays none.
School fee rates for districts in Fremont (1)

The city's fee page sends you to Fremont Unified for school fees.[14]

  • Fremont Unified School District[9]ADUs of 500 sq ft or less are exempt. Above that, the whole square footage is charged. $5.38/sq ft

How the permit works

  1. 1

    Check your lot against the ADU handout

    The city's handout covers size, height, setbacks and separation. Call the Zoning Line at 510-494-4455 with questions.[2][4]

  2. 2

    Talk to the utilities early

    PG&E requires a separate electric meter for an ADU. ACWD sets water fees and Union Sanitary sets sewer fees.[2]

  3. 3

    Prepare plans or pick a preapproved plan

    Preapproved plans still need site-specific plans and engineering. You contract with the plan's designer.[7]

  4. 4

    Apply on Accela Citizen Access

    You need a ministerial design review permit, a building permit and a new address. You can ask for both permits to be reviewed at the same time.[2]

  5. 5

    Pay fees, get the permit and build

    City permit fees apply to every ADU. School and utility fees are paid to Fremont Unified, ACWD and Union Sanitary.[2]

Review time: 15 business days for a standard ADU application, 7 business days with a preapproved plan.[7]

State deadline: Fremont's code gives the city 15 business days to say if your application is complete and 60 days to issue the permit for a complete one.[1]

Apply at: Accela Citizen Access

Preapproved plans

Fremont preapproves detached ADU plans. You pay a flat $1,000 plan review fee, and review takes 7 business days instead of 15. All plans approved under the 2022 code stopped working on Jan 1, 2026, so only one plan is current.[7]

Who qualifies: Usable anywhere in Fremont. You still need site-specific plans, studies and engineering.

  • Basically Homes (Vitalizebuild Construction) 1 bed / 1 bath, 499 sq ft

Five designers with 2022-code plans (Adore Homes, ALIGCUS, Cottage, Expand ADU, J Kretschmer Architect) must resubmit before you can use them. The city publishes no plan prices.

Common questions

What are the ADU requirements in Fremont?

A detached ADU can be up to 1,200 sq ft and 16 ft tall (18 ft near major transit), 4 ft from side and rear lines. You don't need parking, and you don't have to live on the property unless you build a JADU that shares a bathroom.[1][2]

How big can an ADU be in Fremont?

1,200 sq ft detached, 1,000 sq ft attached and 500 sq ft for a junior ADU. Converting existing space has no size limit.[1][2]

How much does an ADU permit cost in Fremont?

The city publishes no total. Building fees follow a valuation table, and a preapproved plan pays a flat $1,000 for plan review. There are no city impact fees, but Union Sanitary charges $6.46 per sq ft for a detached ADU and Fremont Unified charges $5.38 per sq ft over 500 sq ft.[3][7][2][10][9]

Do I need parking for an ADU in Fremont?

No. Fremont requires no parking for an ADU, and no replacement parking if you convert or tear down a garage.[1][2]

Does Fremont have pre-approved ADU plans?

Yes, but only one is current: a 499 sq ft 1-bedroom from Basically Homes. Plans approved under the 2022 code stopped working on Jan 1, 2026.[7]

What we couldn't confirm

  • The city publishes no ADU fee total or estimator, so there is no headline fee.
  • The fee schedule does not say whether the $3,137 construction tax applies to ADUs.
  • ACWD's fee schedule has no ADU line; how the $11,093 connection charge applies to an ADU is not published.
  • Not verified whether any district other than Fremont Unified serves part of Fremont.

Sources

Every fact on this page links to one of these. We read each one on the date shown.

  1. 1. City of Fremont (Code Publishing) ADU standards, 15-business-day/60-day timeline, utility connection rule Checked Oct 18, 2026
  2. 2. City of Fremont Planning Division ADU Informational Handout, single-family zoning (updated 1/5/2026): detached 1,200 sq ft, attached 1,000 sq ft Checked Oct 18, 2026
  3. 3. City of Fremont Master Fee Schedule, Reso Checked Oct 18, 2026
  4. 4. City of Fremont ADU hub: FMC 18.190.005 (effective Aug 11, 2023, Ord Checked Oct 18, 2026
  5. 5. City of Fremont ADU/JADU Amnesty Program (AB 2533, Gov Checked Oct 18, 2026
  6. 6. City of Fremont Master Fee Schedule Exhibit 1, minimum building permit valuation per sq ft, effective Jan 5, 2026: R-3 one- an Checked Oct 18, 2026
  7. 7. City of Fremont Re-confirms S112 Checked Oct 18, 2026
  8. 8. City of Fremont (Code Publishing) Exemption for remodels/additions incl Checked Oct 18, 2026
  9. 9. Fremont Unified School District $5.38/sq ft residential eff Checked Oct 18, 2026
  10. 10. Union Sanitary District ADU $6.46/sq ft FY2027 eff Checked Oct 18, 2026
  11. 11. Union Sanitary District Capacity charge not an impact fee Checked Oct 18, 2026
  12. 12. Alameda County Water District FCC $11,093 per SFR unit Checked Oct 18, 2026
  13. 13. California Department of Housing and Community Development (HCD) All state ADU/JADU rules used in state_baseline.md (sizes, heights, setbacks, parking, owner-occupancy, JADU, Checked Oct 18, 2026
  14. 14. City of Fremont Re-confirms S114 Checked Oct 18, 2026