Skip to content
Bay Area ADU Builders

What an ADU costs in Fremont

Two numbers, kept apart. City fees come from the city's own fee pages. The build price is our estimate from the last owner survey and today's published prices. How we got it

Official City fees

Line by line

The city doesn't publish a total for an ADU, so we list each charge.See every fee [1][2]

Our estimate Building it

$350k–465k

750 sq ft detached, design and construction. Middle of the range: $405k.[3][4][5][6]

All in, before school and utility fees: about $350k to $465k for a 750 sq ft detached ADU. Adjust it for your lot

10 licensed builders list Fremont on their own sites. Your quote request goes to the Bay Area ADU Builders team.

Get 3 quotes

Estimate your ADU

Change the type and size. City fees come from Fremont's own averages; the building cost is our estimate.

Type
School districts
Building it (our estimate)
—
City permit fees (city average)
—
School fees (rate × the whole ADU once it's over 500 sq ft, capped at $5.38)
—
Likely total
—

Building (middle) City fees School fees

Not included: water and sewer connection, and site surprises like a long utility run or a crane. See the fee list below.

Get 3 quotes to check this number

Licensed builders who list Fremont

All 10

The top three by our public score for Fremont. Some publish prices, which is the quickest check on the estimate above.

Every fee Fremont can charge

Building plan check and inspection (valuation table) $967.27 for the first $100,000 of valuation, plus $5.91 per extra $1,000 up to $500,000[1][7] Minimum valuation for a new wood-frame home (R-3, type VB) is $210.01 per sq ft. Add a $153 application fee, a 15% community planning fee and a 3% technology fee. Trade plan check on new construction is 25% of building plan check, $292 minimum per trade.
Ministerial design review (ADU/JADU, new) $2,000 deposit, billed at cost[1]
Plan review with a preapproved plan $1,000 flat[8] Construction and inspection fees still apply.
New address $278[1][2] Every ADU and JADU needs its own address.
Construction tax $3,137 per new single-family dwelling unit[1] The schedule has no ADU line. Ask the city whether it applies to your ADU.
City impact fees $0 at any size[2][9] Fremont says ADUs are not subject to its development impact fees, regardless of size.
School fees (Fremont Unified) $5.38 per sq ft over 500 sq ft[10] ADUs of 500 sq ft or less pay nothing. Above that, the whole square footage is charged.
Sewer capacity charge (Union Sanitary District) $6.46 per sq ft from Oct 1, 2026[11][12] Applies to detached ADUs and additions over 150 sq ft; none for an ADU inside existing living space. USD says this is not an impact fee, so the state exemption under 750 sq ft does not apply. It rises each year to $7.18 per sq ft in FY2032.
Water connection (Alameda County Water District) $11,093 per single-family dwelling unit[13][14] ACWD's schedule has no ADU line. State law says utility charges for an ADU must be in proportion to its size or plumbing fixtures, and an ADU inside existing space pays none.

How we estimate the building cost

The last survey of what Bay Area owners actually paid is from UC Berkeley in 2021: a median of $329 per sq ft for ADUs permitted in 2018 and 2019.[3] Construction prices in California have risen about 60% since then by the state's own cost index (2018-2019 average 6,719 to September 2026: 10,717).[4] We check that against two current numbers and use the spread as the range.

  • UC Berkeley 2021 owner survey, Bay Area median for ADUs built 2018-19 ($329 per sq ft), raised by the California Construction Cost Index (x1.595)[3][4] $525/sq ft
  • San Mateo County ADU Resource Center rule of thumb for design, construction and fees[5] $450 to 600/sq ft
  • Abodu published all-in price, 800 sq ft 2 bed / 2 bath ($424,800)[6] $531/sq ft

Other ADU types

  • Attached ADU: Detached band scaled by the survey's addition-to-detached ratio ($250 vs $300 per sq ft statewide)[3] $375 to 500/sq ft
  • Garage conversion: UC Berkeley 2021 owner survey, statewide median for garage ADUs ($189 per sq ft), raised by the California Construction Cost Index[3][4] $302/sq ft
  • Garage conversion: Same, with the survey's Bay Area premium over the statewide median (x1.32)[3][4] $397/sq ft
  • Garage conversion: SYMBiHOM published garage conversion price, $150K to $225K (per sq ft at a 400 sq ft two-car garage)[15] $375 to 560/sq ft
  • Junior ADU: UC Berkeley 2021 owner survey, statewide median for converting part of the main home ($173 per sq ft), raised by the California Construction Cost Index[3][4] $276/sq ft
  • Junior ADU: Same, with the survey's Bay Area premium (x1.32)[3][4] $363/sq ft

Smaller units cost more per foot. We scale by size the way Abodu's own price list does. The survey counted design and permits in its figure, so a little of the city fee may overlap.

Prefab prices you can check

Abodu published all-in prices (home + typical installation).[6]

  • Studio, 385 sq ft$298,800
  • 1 bed, 500 sq ft$324,800
  • 2 bed / 1 bath, 625 sq ft$358,800
  • 2 bed / 2 bath, 800 sq ft$424,800
  • 3 bed / 2 bath, 1,070 sq ft$464,800
  • 3 bed / 3 bath, 1,195 sq ft$498,800

Not included: Survey package ($6,000), trenching past 50 ft, crane past 100 ft, demolition, site engineering and sales tax.

What other sites say

  • 9Builders: $150,000 to $350,000 in San Jose[16]
  • IMKAT Homes: $205,000 to $415,000 by size[17]
  • ADU Builders Group: $450 to $475 per sq ft[18]
  • SYMBiHOM: $250,000 to $500,000 for a 500 to 1,200 sq ft backyard ADU[15]

None of these pages cites where its number comes from.

Common questions

How much does it cost to build an ADU in Fremont?

For a 750 sq ft detached ADU, our estimate is $350,000 to $465,000 to build. School and utility fees can add more.[1][2][3][4][5]

What are the ADU permit fees in Fremont?

The city doesn't publish a total. No published total; see fee lines The fee lines on this page list each charge.[1][2]

Do ADUs under 750 sq ft pay impact fees?

No. State law bars impact fees on ADUs under 750 sq ft. Larger ADUs pay in proportion to the main home. School fees follow a different rule, and districts disagree about it, so ask yours.[14]

Is a garage conversion cheaper than a new ADU?

Usually. In the 2021 UC Berkeley survey, garage ADUs had a median cost of $90,000 statewide against $180,000 for detached ones. Raised to 2026 prices, a 400 sq ft garage conversion lands around $120k to $225k by our estimate.[3][4][15]

Sources

Every fact on this page links to one of these. We read each one on the date shown.

  1. 1. City of Fremont Master Fee Schedule, Reso Checked Oct 18, 2026
  2. 2. City of Fremont Planning Division ADU Informational Handout, single-family zoning (updated 1/5/2026): detached 1,200 sq ft, attached 1,000 sq ft Checked Oct 18, 2026
  3. 3. UC Berkeley Center for Community Innovation Statewide median $150,000/$250sf Checked Oct 18, 2026 read from an archived copy of this official page
  4. 4. California Department of General Services California Construction Cost Index (ENR BCI average of San Francisco and Los Angeles) Checked Oct 18, 2026
  5. 5. San Mateo County ADU Resource Center $450-$600/sf all-in placeholder Checked Oct 18, 2026
  6. 6. Abodu Home From $234,800 Checked Oct 18, 2026
  7. 7. City of Fremont Master Fee Schedule Exhibit 1, minimum building permit valuation per sq ft, effective Jan 5, 2026: R-3 one- an Checked Oct 18, 2026
  8. 8. City of Fremont Re-confirms S112 Checked Oct 18, 2026
  9. 9. City of Fremont (Code Publishing) Exemption for remodels/additions incl Checked Oct 18, 2026
  10. 10. Fremont Unified School District $5.38/sq ft residential eff Checked Oct 18, 2026
  11. 11. Union Sanitary District ADU $6.46/sq ft FY2027 eff Checked Oct 18, 2026
  12. 12. Union Sanitary District Capacity charge not an impact fee Checked Oct 18, 2026
  13. 13. Alameda County Water District FCC $11,093 per SFR unit Checked Oct 18, 2026
  14. 14. California Department of Housing and Community Development (HCD) All state ADU/JADU rules used in state_baseline.md (sizes, heights, setbacks, parking, owner-occupancy, JADU, Checked Oct 18, 2026
  15. 15. SYMBiHOM Garage conversion $150K-$225K Checked Oct 18, 2026
  16. 16. 9Builders FAQ: SJ ADU $150k-$350k, rents $1,800-$3,000/mo, unsourced Checked Oct 18, 2026
  17. 17. IMKAT Size-tier cost table $205k-$415k, unsourced Checked Oct 18, 2026
  18. 18. ADU Builders Group $450-$475/sq ft Checked Oct 18, 2026