Acton ADU
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
- Detached
- Ready-made plans
- Lists Los Gatos on its own site
- No public complaints on its CSLB record
- Publishes general price ranges
What the city allows, what it charges, and which licensed builders work here. Checked against the city's ADU pages on Oct 18, 2026.
The Town is rewriting its ADU rules. The Town Council was due to review a draft on August 4, 2026, and the outcome isn't posted yet. These are the rules from the Town's 2024 brochure.[3][1] Compare them
Ranked by a public score anyone can check: license, years licensed, ADU types and cities shown on their own sites, a local office, and published prices. Nobody pays to move up. Quote requests go to our team with the builder you picked. How we rank
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
Based in Santa Clara, Santa Clara County
CSLB #889458 active Class B Licensed 19 years
Based in Los Gatos, Santa Clara County
CSLB #1126603 active Class B Licensed 2 years
Based in Pleasanton, Alameda County
CSLB #1094866 active Class B Licensed 4 years
Based in San Jose, Santa Clara County
CSLB #1137392 active Class B Licensed 1 year
Based in San Jose, Santa Clara County
CSLB #1132916 active Class B Licensed 1 year
7 Based in Santa Clara, Santa Clara County
CSLB #1104475 active Class B Licensed 3 years
Based in Los Gatos, Santa Clara County
CSLB #1060310 active Class B Licensed 6 years
Based in Redwood City, San Mateo County
CSLB #1102654 active Class B Licensed 3 years
Based in Redwood City, San Mateo County
CSLB #1119693 active Class B Licensed 2 years
Based in Beverly Hills, outside the Bay Area; serves Los Gatos from there
CSLB #1160077 active Class B Licensed under a year
Based in San Jose, Santa Clara County
CSLB #1128719 active Class B Licensed 1 year
Detached ADU, max size[1]
Attached ADU, max size[1]
Junior ADU (inside the house)[1]
Height[1]
Side and rear setbacks[1]
Floor area and lot coverage[1]
Units on a single-family lot[1]
Parking[1]
Owner must live on site[1]
| Building permit, by valuation | $1,749 for the first $100,000, plus $9.84 per $1,000 up to $500,000[2] Valuation is the ICC table × 2.32 (× 3.246 on hillside lots). FY 2026-27 schedule, effective July 1, 2026. |
|---|---|
| Plan review and surcharges | Plan review 65% and Title 24 surcharge 15% of the building fee; $68 issuance; electrical, mechanical and plumbing $0.12 per sq ft each[2] |
| Planning add-ons | Planning plan check 20% of the building fee; General Plan surcharge 0.5% of valuation; 4% permit tracking[5] |
| Traffic impact fee | $0 under 750 sq ft; $1,128 per daily trip at 750 sq ft and up, scaled to the main home[1][2] The Town does not publish the trip rate it uses for an ADU. |
| Construction taxes | $0.18 capital improvement + $0.18 underground utility + $0.04 park fund, per sq ft of added floor area[2] The schedule doesn't say whether these apply to a detached ADU. |
| School fees | Los Gatos Union SD $4.07 + Los Gatos-Saratoga Union HSD $1.66 per sq ft[6][7][8] LGUSD charges nothing on remodels under 500 sq ft. Campbell Union HSD ($1.61) also lists Los Gatos. Check which districts serve your parcel. |
| Sewer connection (West Valley Sanitation District) | $6,727 max connection + $1,024 max treatment plant capacity[9] Smaller ADUs pay $511.16 and $73.53 per drainage fixture unit. The district's fee tables are labeled FY2018/19 to FY2020/21. |
| Water (San Jose Water) | No published ADU fee[10] San Jose Water quotes new service installation costs case by case. |
One application and one plan review cover Planning and Building.[12]
File on the Town permit portal. Fees are invoiced before review starts.[12]
The Town routes your plans to its departments and to outside agencies such as West Valley Sanitation District and County Fire. Expect more than one round.[12]
State deadline: State law gives the Town 15 business days to say if your application is complete and 60 days to approve or deny a complete one.[13]
Apply at: Los Gatos permit portal
The Town has an ADU Plans Gallery of pre-approved plans. You can't change a pre-approved plan.[3]
We could not read the gallery's plan list, and no prices are published.
An ADU can be 1,200 sq ft, with 4 ft side and rear setbacks and 5 ft from other buildings. Most ground-floor ADUs are capped at 16 ft. You need 1 parking space unless an exception applies.[1]
1,200 sq ft. Up to 800 sq ft doesn't count toward your floor area, and a junior ADU can be up to 500 sq ft.[1]
Usually 1 space, which can be in the driveway or tandem. Town Code 29.10.320(f)(1) lists exceptions. A junior ADU needs none.[1]
The Town publishes no total. The building permit comes from valuation, plus 65% for plan review and 15% for Title 24. ADUs under 750 sq ft pay no traffic impact fee; sewer connection runs up to $6,727 plus $1,024.[2][1][9]
Yes. The Planning Commission recommended a new ADU ordinance on June 10, 2026, and the Town Council was due to review it on August 4, 2026.[3]
Every fact on this page links to one of these. We read each one on the date shown.