Acton ADU
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
- Detached
- Ready-made plans
- Lists Saratoga on its own site
- No public complaints on its CSLB record
- Publishes general price ranges
What the city allows, what it charges, and which licensed builders work here. Checked against the city's ADU pages on Oct 18, 2026.
Ranked by a public score anyone can check: license, years licensed, ADU types and cities shown on their own sites, a local office, and published prices. Nobody pays to move up. Quote requests go to our team with the builder you picked. How we rank
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
Based in Santa Clara, Santa Clara County
CSLB #889458 active Class B Licensed 19 years
Based in Los Gatos, Santa Clara County
CSLB #1126603 active Class B Licensed 2 years
Based in Pleasanton, Alameda County
CSLB #1094866 active Class B Licensed 4 years
Based in San Jose, Santa Clara County
CSLB #1137392 active Class B Licensed 1 year
Based in San Jose, Santa Clara County
CSLB #1132916 active Class B Licensed 1 year
Based in Mill Valley, Marin County
CSLB #1117837 active Class B Licensed 2 years
8 Based in Santa Clara, Santa Clara County
CSLB #1104475 active Class B Licensed 3 years
Based in Los Gatos, Santa Clara County
CSLB #1060310 active Class B Licensed 6 years
Based in Redwood City, San Mateo County
CSLB #1102654 active Class B Licensed 3 years
Based in Beverly Hills, outside the Bay Area; serves Saratoga from there
CSLB #1160077 active Class B Licensed under a year
Based in San Jose, Santa Clara County
CSLB #1128719 active Class B Licensed 1 year
Detached ADU, max size[1]
Attached ADU, max size[1]
Junior ADU (inside the house)[1]
Height[1]
Side and rear setbacks[1]
Floor area and lot coverage[1]
Units on a single-family lot[1]
Parking[1]
Owner must live on site[1]
| Building permit, by valuation | $1,693 for the first $100,000, plus $9.60 per $1,000 up to $500,000[2] Valuation is the ICC table × 2.9. Fee schedule effective July 1, 2026. |
|---|---|
| Plan check and surcharges | Plan check 66% of the permit fee; 8.10% technology surcharge; General Plan fee 0.285% of valuation; $170 address processing[2] |
| Park development fee | $0 up to 750 sq ft; above that, a share of $56,845 scaled to the main home[2][1][3] The city's 2024 handout says ADUs under 700 sq ft are exempt; the newer web page says 750. |
| Below-market rent fee waiver | All planning, building and engineering fees waived[2] Only for an ADU or JADU deed-restricted to below-market renters. |
| School fees | Saratoga Union SD $0.70 + Los Gatos-Saratoga Union HSD $1.66 per sq ft[4][5][6] Saratoga Union SD charges nothing under 500 sq ft. Campbell Union HSD also lists Saratoga, and Cupertino Union, Fremont Union HSD and Moreland may serve some parcels. Check yours. |
| Sewer connection (West Valley Sanitation District) | $6,727 max connection + $1,024 max treatment plant capacity[3][7] The city lists West Valley Sanitation as the sewer contact. Smaller ADUs pay $511.16 and $73.53 per drainage fixture unit. |
| Water | No published ADU fee[3][8] The city says some ADUs need a new water or sewer connection. San Jose Water quotes new service costs case by case. |
District lines in Saratoga were not checked against a boundary map. You pay both your elementary and high school district.[4][5][6]
Read the city's ADU page for sizes, heights and setbacks.[1]
Email your building permit submittal to building@saratoga.ca.us.[1]
The city's handout says you'll get application feedback within 15 days.[3]
Book inspections on the city's online portal. You can move in after the final inspection.[1]
Saratoga accepts designer plans for pre-approval under AB 1332. No list of approved plans was found.[13]
No approved plans or prices are published yet.
A detached ADU can be 1,200 sq ft of living area with 4 ft side and rear setbacks. It can be 16 ft tall inside the required setbacks or 18 ft outside them. You need 1 uncovered parking space unless an exemption applies.[1]
1,200 sq ft, or 1,000 sq ft if it sits inside the required setbacks and 800 sq ft in the front setback. An attached ADU is also capped at half the main home. A junior ADU is up to 500 sq ft.[1]
Usually 1 uncovered space. You need none within 1/2 mile of transit, for a JADU, or for an ADU inside the house or an accessory building.[1]
The city publishes no total. The building permit comes from valuation, plus 66% for plan check and an 8.10% technology surcharge. ADUs up to 750 sq ft pay no park fee, and all fees are waived for a below-market deed-restricted ADU.[2][1]
A single-family lot can have 1 attached ADU, 1 detached ADU and 2 attached junior ADUs.[1]
Every fact on this page links to one of these. We read each one on the date shown.