Acton ADU
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
- Detached
- Ready-made plans
- Lists Cupertino on its own site
- No public complaints on its CSLB record
- Publishes general price ranges
Compare builders that name Cupertino in their service areas. Filter by your ADU type, then check the evidence before requesting a quote.
What the city allows, what it charges, and which licensed builders work here. Checked against the city's ADU pages on Oct 18, 2026.
The city's ADU page still says one detached ADU plus one JADU. The current code (Ord. 25-2274) allows up to 3 ADUs on a single-family lot.[1][3] Compare them
Ranked by a public score anyone can check: license, years licensed, ADU types and cities shown on their own sites, a local office, and published prices. Nobody pays to move up. Quote requests go to our team with the builder you picked. How we rank
A service-area listing tells you where a company advertises work. It does not establish a completed Cupertino ADU, current availability or a price for your lot. Ask for a comparable local project and a written scope.
Directory records checked Oct 18, 2026. Use each builder’s service-area and CSLB links below to recheck the records before you hire.
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
Based in Santa Clara, Santa Clara County
CSLB #889458 active Class B Licensed 19 years
Based in Los Gatos, Santa Clara County
CSLB #1126603 active Class B Licensed 2 years
Based in Pleasanton, Alameda County
CSLB #1094866 active Class B Licensed 4 years
Based in San Jose, Santa Clara County
CSLB #1132916 active Class B Licensed 1 year
Based in Mill Valley, Marin County
CSLB #1117837 active Class B Licensed 2 years
7 Based in Santa Clara, Santa Clara County
CSLB #1104475 active Class B Licensed 3 years
Based in Redwood City, San Mateo County
CSLB #1102654 active Class B Licensed 3 years
Based in Redwood City, San Mateo County
CSLB #1119693 active Class B Licensed 2 years
Based in Beverly Hills, outside the Bay Area; serves Cupertino from there
CSLB #1160077 active Class B Licensed under a year
Based in San Jose, Santa Clara County
CSLB #1128719 active Class B Licensed 1 year
12 Based in Santa Clara, Santa Clara County
CSLB #1133829 active Class B Licensed 1 year
Open the CSLB link on each builder card. Match the legal name and license number to your proposed contract, and review the current status, classification, bond and workers’ compensation information.
Check a license on CSLBUse the service-area link on the card to check the company’s claim. Ask for a Cupertino permit number and the ADU type, then check the record through the city’s permit resources. A service-area page alone is not a project reference.
Cupertino ADU and permit resourcesIf a builder offers a preapproved plan, compare the exact plan and vendor with Cupertino’s list below. Ask who handles the site plan, utility design and permit corrections for your parcel.
See Cupertino’s preapproved plansAsk each bidder to separate design and permits, foundation and site work, utility connections, construction and exclusions. Compare the same ADU size and type. Keep city, school and utility charges separate from the builder’s construction price.
Review Cupertino ADU cost and fee linesAttached ADU, max size[3]
Junior ADU (inside the house)[1]
Height[3]
Side and rear setbacks[2]
Floor area and lot coverage[2]
Units on a single-family lot[3]
Owner must live on site[1]
| ADU plan check | $2,795 up to 499 sq ft; $4,058 for 500 to 999 sq ft[4] Resolution 26-047, effective July 1, 2026. |
|---|---|
| ADU inspection | $2,975 up to 499 sq ft; $4,164 for 500 to 999 sq ft[4] ADUs of 1,000 sq ft and up have no separate ADU line. |
| Park land in-lieu fee | $0 under 750 sq ft; at 750 sq ft and up, $15,000 or a share scaled to the main home, whichever is less[6][1] |
| Storm drain fee | $0 under 750 sq ft[1][6] Larger ADUs may pay the per-unit Master Storm Drain Area fee. |
| School fees | Cupertino Union SD $3.23 + Fremont Union HSD $2.15 per sq ft[7][8][1][9] The city says ADUs under 750 sq ft pay no school fees. Fremont Union HSD's own sheet exempts 500 sq ft or less. Ask both districts. |
| Water and sewer | Not published by the city[1] The city says to ask your water provider and PG&E whether you need separate meters. |
Email planning@cupertino.gov to check your plan against the zoning code.[1]
Use your own designer or a pre-approved detached plan if your lot is in the Valley Floor zone.[10]
Submit plans through Avolve and track the permit on Accela.[11]
Typical review is 10 days per round, but the first review now averages 20 to 30 business days.[11]
ADU plan check and inspection are flat fees by size under Schedule D.[4]
Review time: Typical ADU review is 10 days for the first round. With high volume, the first review now averages 20 to 30 business days.[11]
State deadline: State law gives the city 15 business days to say if your application is complete and 60 days to approve or deny a complete one.[12]
Apply at: Avolve plan review portal
Cupertino has pre-approved detached ADU plans for parcels in the Valley Floor zone.[10]
Who qualifies: Valley Floor zone only; not in fault rupture, slope instability, hillside, liquefaction or inundation zones.
The city lists no vendor prices. Plan check and inspection fees still apply.
A streamlined ADU is up to 800 sq ft with 4 ft side and rear setbacks and no parking. A detached one can be 18 ft tall. You need a building permit.[2][3][1]
850 sq ft with a studio or 1 bedroom, or 1,000 sq ft with 2 or more bedrooms. ADUs up to 800 sq ft skip the floor area and lot coverage limits. A junior ADU is up to 500 sq ft.[1][2]
Not for a streamlined ADU. A larger one needs 1 space only if the main home is short on parking, and none within 1/2 mile of transit.[2][3]
For 500 to 999 sq ft, ADU plan check is $4,058 and inspection is $4,164. ADUs under 750 sq ft pay no park or storm drain fees. School fees go to Cupertino Union and Fremont Union HSD.[4][1][7][8]
Typical review is 10 days per round, but the first review now averages 20 to 30 business days.[11]
Every fact on this page links to one of these. We read each one on the date shown.