What the city allows, what it charges, and which licensed builders work here. Checked against the city's ADU pages on Oct 18, 2026.
Ranked by a public score anyone can check: license, years licensed, ADU types and cities shown on their own sites, a local office, and published prices. Nobody pays to move up. Quote requests go to our team with the builder you picked. How we rank
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
Based in Santa Clara, Santa Clara County
CSLB #889458 active Class B Licensed 19 years
Based in Los Gatos, Santa Clara County
CSLB #1126603 active Class B Licensed 2 years
Based in Pleasanton, Alameda County
CSLB #1094866 active Class B Licensed 4 years
Based in San Jose, Santa Clara County
CSLB #1137392 active Class B Licensed 1 year
Based in San Jose, Santa Clara County
CSLB #1132916 active Class B Licensed 1 year
Based in Mill Valley, Marin County
CSLB #1117837 active Class B Licensed 2 years
8 Based in Santa Clara, Santa Clara County
CSLB #1104475 active Class B Licensed 3 years
Based in Redwood City, San Mateo County
CSLB #1119693 active Class B Licensed 2 years
Based in Beverly Hills, outside the Bay Area; serves Sunnyvale from there
CSLB #1160077 active Class B Licensed under a year
11 Based in Livermore, Alameda County
CSLB #1081083 active Class B Licensed 5 years
Based in San Jose, Santa Clara County
CSLB #1128719 active Class B Licensed 1 year
13 Based in Santa Clara, Santa Clara County
CSLB #1133829 active Class B Licensed 1 year
Attached ADU, max size[1]
Conversion of existing space[1]
Junior ADU (inside the house)[2][1]
Height[1]
Side and rear setbacks[1]
Floor area and lot coverage[1]
Units on a single-family lot[2][1]
Parking[3]
Owner must live on site[1]
| Building permit, by valuation | $2,445 for the first $100,000 of valuation, plus $13.50 per $1,000 up to $500,000[4] The Building Division sets valuation from its own tables. FY 2026/27 fees, effective Aug 18, 2026. |
|---|---|
| Plan check, energy and fire | Plan check 70%, energy plan check 10% and fire permit 70% of the building permit fee[4] |
| Issuance and trade permits | $42.50 issuance; 5% technology surcharge; electrical, mechanical and plumbing $0.15 per sq ft each ($130 minimum)[4] |
| Construction tax and General Plan fee | 0.54% plus 0.15% of valuation[4] |
| Transportation impact fee | $0 at 750 sq ft and under; larger ADUs pay a share of $5,095 per single-family home[1][5][3] Rate for south of Route 237. The ADU's share is set in proportion to the main home. |
| Park in-lieu fee | $0 under 750 sq ft[5][6] The impact fee sheet has no ADU line. State law bars impact fees under 750 sq ft. |
| School fees | New ADUs 500 sq ft and up; $1.72 to $5.38 per sq ft by district[1][5][7][8][9][10] Sunnyvale SD charges $3.32 and Fremont Union HSD $2.06 in its Sunnyvale area. You pay both your elementary and high school district, directly to them, before the permit is issued. |
| Sewer and water connection (City of Sunnyvale) | $0; incremental connection fees are exempt for single-family ADUs[1] Once the ADU is finaled, your lot is billed at two-unit multifamily utility rates. More than 5 toilets on site means a 4-inch sewer line. |
Five elementary districts and two high school districts serve Sunnyvale. If your lot is in both an elementary and a high school district, you pay both.[5]
New ADUs up to 800 sq ft on a single-family lot, conversions and JADUs need only a building permit.[2]
Apply at the Online Permit Center. A planner sends an invoice, and review takes 2 to 4 weeks from payment.[1]
Use your own plans or a plan from the city's pre-approved ADU Plans Gallery.[2]
School fees are paid directly to the districts before the building permit is issued.[5]
Utility billing switches to two-unit rates the day the ADU is signed off.[1]
A new ADU can be 150 to 1,000 sq ft with 4 ft side and rear setbacks. A detached ADU can be 16 ft tall, or 18 ft near major transit. Up to 800 sq ft needs only a building permit.[1][2]
1,000 sq ft for a new ADU on a single-family lot. A conversion has no size cap, and a junior ADU can be up to 500 sq ft.[1]
No. The ADU code requires no parking, and you don't have to replace covered parking you remove.[3]
The city publishes no total. The building permit comes from a valuation table, with plan check and fire each adding 70% of that fee. ADUs of 750 sq ft or less pay no transportation impact fee, and sewer and water connection fees are exempt.[4][1]
Up to 3 on a single-family lot: one new ADU, one conversion and one junior ADU.[2]
Every fact on this page links to one of these. We read each one on the date shown.