Acton ADU
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
- Detached
- Ready-made plans
- Lists Palo Alto on its own site
- No public complaints on its CSLB record
- Publishes general price ranges
What the city allows, what it charges, and which licensed builders work here. Checked against the city's ADU pages on Oct 18, 2026.
Ranked by a public score anyone can check: license, years licensed, ADU types and cities shown on their own sites, a local office, and published prices. Nobody pays to move up. Quote requests go to our team with the builder you picked. How we rank
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
Based in Santa Clara, Santa Clara County
CSLB #889458 active Class B Licensed 19 years
Based in Los Gatos, Santa Clara County
CSLB #1126603 active Class B Licensed 2 years
Based in Pleasanton, Alameda County
CSLB #1094866 active Class B Licensed 4 years
Based in San Jose, Santa Clara County
CSLB #1137392 active Class B Licensed 1 year
Based in San Jose, Santa Clara County
CSLB #1132916 active Class B Licensed 1 year
Based in Mill Valley, Marin County
CSLB #1117837 active Class B Licensed 2 years
8 Based in Santa Clara, Santa Clara County
CSLB #1104475 active Class B Licensed 3 years
Based in Redwood City, San Mateo County
CSLB #1102654 active Class B Licensed 3 years
Based in Redwood City, San Mateo County
CSLB #1119693 active Class B Licensed 2 years
Based in Beverly Hills, outside the Bay Area; serves Palo Alto from there
CSLB #1160077 active Class B Licensed under a year
12 Based in Livermore, Alameda County
CSLB #1081083 active Class B Licensed 5 years
13 Based in Santa Clara, Santa Clara County
CSLB #1133829 active Class B Licensed 1 year
Attached ADU, max size[2]
Junior ADU (inside the house)[1]
Side and rear setbacks[2]
Floor area and lot coverage[2]
Units on a single-family lot[1]
| Detached ADU building permit | $7,346 per permit; $2,653 for a master-plan permit[3] Site-specific permits tied to a master plan: $3,929 for prefab, $5,481 for site-built. |
|---|---|
| Plan checks | Building plan check 125% of the permit fee; planning and public works plan checks 35% each[3] The schedule does not say whether these apply on top of the flat ADU fee. |
| City guidebook ranges | $2,000 to $8,000 in building permit fees; $10,000 to $80,000 in impact fees[6] Impact fees apply only at 750 sq ft and up. |
| Development impact fees (parks, community center, library, public safety, general government) | $0 under 750 sq ft. At 750 sq ft and up, a share of the single-family rates: parks $18.75, community center $1.44, libraries $0.86 per sq ft; public safety $1,383 and general government $1,743 per unit[7][3] The share is in proportion to the size of the main home. JADUs and garage conversions with no added floor area are exempt. |
| School fees | Palo Alto Unified $4.79 per sq ft; Los Altos SD $3.58 per sq ft[8][9][10][6] Only for ADUs over 500 sq ft. You pay the district directly; the city does not collect it. |
| Water capacity charge (City of Palo Alto Utilities) | $3,750 for a 5/8 x 3/4-inch meter; $6,250 for a 1-inch meter[3][2] Charged when CPAU requires a new service. A JADU is not a separate unit for water, sewer or power. |
| Wastewater capacity charge (City of Palo Alto Utilities) | $5,250 for a 4-inch connection with a 5/8-inch meter; $10,500 with a 1-inch meter[3] |
Book a virtual or in-person appointment at the Development Center, 285 Hamilton Ave, to confirm your lot qualifies.[6]
Pay permit fees, answer plan check comments, pay any fees still due, then get the permit.[6]
Your contractor calls for city inspections. Final inspection approval closes the permit.[6]
Palo Alto's ADU Plans Gallery lists master detached designs. A site-specific permit tied to a master plan costs $3,929 for prefab or $5,481 for site-built, compared with $7,346 for a custom detached ADU.[12][3]
We could not read the designer list on the gallery site. You buy plans from the designer.
A detached ADU can be 900 sq ft, or 1,000 sq ft with 2 or more bedrooms. At 800 sq ft or less with 4 ft setbacks, it follows the simpler state-exempt rules. A junior ADU inside the house is up to 500 sq ft.[1][2]
No. Palo Alto requires no parking for an ADU, and you don't have to replace a garage you convert or tear down.[1][2]
The flat building permit for a detached ADU is $7,346, or $3,929 to $5,481 with a master plan. Impact fees start at 750 sq ft, and Palo Alto Unified charges $4.79 per sq ft in school fees over 500 sq ft.[3][7][9]
16 ft for a detached ADU, or 18 ft within 1/2 mile of a major transit stop, plus 2 ft to match the main roof pitch. An attached ADU can be 25 ft or the zone limit, whichever is lower.[2]
Every fact on this page links to one of these. We read each one on the date shown.