Acton ADU
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
- Detached
- Ready-made plans
- Lists Milpitas on its own site
- No public complaints on its CSLB record
- Publishes general price ranges
What the city allows, what it charges, and which licensed builders work here. Checked against the city's ADU pages on Oct 18, 2026.
Ranked by a public score anyone can check: license, years licensed, ADU types and cities shown on their own sites, a local office, and published prices. Nobody pays to move up. Quote requests go to our team with the builder you picked. How we rank
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
Based in Santa Clara, Santa Clara County
CSLB #889458 active Class B Licensed 19 years
Based in Los Gatos, Santa Clara County
CSLB #1126603 active Class B Licensed 2 years
Based in Pleasanton, Alameda County
CSLB #1094866 active Class B Licensed 4 years
Based in San Jose, Santa Clara County
CSLB #1132916 active Class B Licensed 1 year
Based in Mill Valley, Marin County
CSLB #1117837 active Class B Licensed 2 years
7 Based in Santa Clara, Santa Clara County
CSLB #1104475 active Class B Licensed 3 years
Based in Beverly Hills, outside the Bay Area; serves Milpitas from there
CSLB #1160077 active Class B Licensed under a year
Detached ADU, max size[1]
Attached ADU, max size[1]
Junior ADU (inside the house)[1]
Height[1]
Side and rear setbacks[1]
Units on a single-family lot[1]
Parking[1]
Permit path[1]
Minimum totals from the city's ADU Permit Fee Estimate (FY 2025-26 fees, dated 6/11/2026). They cover building fees plus minimum planning and land development review, for any new ADU of that size. Not included: school fees over 500 sq ft, utility connections, a possible $703 fire sprinkler review and a $709 new address. At 500 sq ft the estimate is $4,048.31.[2]
ADU, 1,200 sq ft
$6,931
ADU, 1,000 sq ft
$6,060
ADU, 800 sq ft
$5,255
| Plan review and inspection, scaled by size | 500 sq ft: $1,390.08 + $1,945.85; 1,000 sq ft: $2,265.84 + $2,918.77[7] Plus a 3.8% permitting automation fee, a 5% community planning fee and state fees. Schedule effective Aug 3, 2026. |
|---|---|
| Planning and land development review | Planning $275 an hour (half-hour minimum); land development $231 an hour (1-hour minimum)[7] |
| No-fee ADU permits | The city covers permit fees for eligible ADUs, about $5,000 on average[6] A limited-time program. The city's notice is undated, so ask adu@milpitas.gov if it is still open. |
| Park and impact fees | No park fee for ADUs; no impact fees under 750 sq ft[2][1] ADUs of 750 sq ft or more pay other impact fees in proportion to the main home. |
| School fees (Milpitas Unified) | $5.17 per sq ft on the whole ADU at 500 sq ft and up[8] |
| Water connection (City of Milpitas) | $1,910 × (ADU sq ft ÷ main home sq ft)[2] Only when a new connection is needed or requested. |
| Sewer and treatment plant connection (City of Milpitas) | $1,908 sewer + $880 treatment plant, each × (ADU sq ft ÷ main home sq ft)[2] Only when a new connection is needed or requested. |
| Fire sprinkler review and new address | $703 sprinkler review if it applies; $709 new address request[2] |
Building, Planning and Land Development staff answer questions on one video call.[4]
Use your own designer, or buy a pre-approved detached plan for a faster review.[5]
The target is 20 business days for the first review and 15 for each resubmittal.[9]
Review time: The city targets 20 business days for the first review of an attached or detached ADU, 15 for resubmittals.[9]
State deadline: City code says Milpitas must act within 60 days of a complete application, or 30 days with a pre-approved plan.[1]
Apply at: Online Plan Submittal
Milpitas has a pre-approved detached ADU program. Plan review is billed by the hour and can be up to 50% faster.[5]
Who qualifies: Not in the Hillside Building Code area, not in a flood zone unless the plan has a flood option, not in an easement, and no changes to the plan. Plans over 800 sq ft need a Minor Site Development Permit.
The city publishes no prices for these plans.
A detached ADU can be 1,200 sq ft and 16 ft tall, with 4 ft side and rear setbacks and an 8 ft front setback. A single-family lot can have 1 attached ADU, 1 detached ADU and 1 JADU.[1]
Up to 1,200 sq ft for a detached ADU. An attached ADU can be half the main home, and 800 sq ft is always allowed. A junior ADU is up to 500 sq ft.[1]
The city's own estimate is $4,048.31 at 500 sq ft, $5,255.11 at 800 sq ft and $6,930.75 at 1,200 sq ft, as minimums. School fees and utility connections are extra. A limited-time city program may cover permit fees for eligible ADUs.[2][6]
Usually 1 space. You need none within a 1/2 mile walk of transit, when the ADU is inside existing space, or under other state exemptions. A junior ADU needs none.[1]