Acton ADU
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
- Detached
- Ready-made plans
- Lists Mountain View on its own site
- No public complaints on its CSLB record
- Publishes general price ranges
Two numbers, kept apart. City fees come from the city's own fee pages. The build price is our estimate from the last owner survey and today's published prices. How we got it
Still choosing the scope? Compare ADU remodeling, garage conversion and new construction in Mountain View before using the estimator.
Official City fees
Line by line
$7,000 to $13,000 in building permit fees, including inspectionsSee every fee [1]
All in, before school and utility fees: about $350k to $465k for a 750 sq ft detached ADU. Adjust it for your lot
13 licensed builders list Mountain View on their own sites. Your quote request goes to the Bay Area ADU Builders team.
Get 3 quotes13 licensed builders list Mountain View on their own sites. Three quotes for your lot show where in the range you land. Your request goes to the Bay Area ADU Builders team.
Get 3 quotesChange the type and size. City fees come from Mountain View's own averages; the building cost is our estimate.
Building (middle) City fees School fees Parkland
Not included: water and sewer connection, and site surprises like a long utility run or a crane. See the fee list below.
Get 3 quotes to check this numberThe top three by our public score for Mountain View. Some publish prices, which is the quickest check on the estimate above.
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
Based in Santa Clara, Santa Clara County
CSLB #889458 active Class B Licensed 19 years
Based in Los Gatos, Santa Clara County
CSLB #1126603 active Class B Licensed 2 years
| Building permit, new ADU (city's typical range) | $7,000 to $13,000[1] Based on a construction valuation of $100,000 to $300,000; includes inspections. Conversions run $3,000 to $5,000 and a JADU $4,000 to $6,000. |
|---|---|
| Excavation permit, if you need utility or sidewalk work | Up to $12,000[1] |
| Land use document fee | 0.24% of construction valuation[6] Collected on all projects at building permit. |
| Citywide transportation fee | $6,273.15 per new single-family unit[6][7] The city's page has no ADU line. State law: no impact fees under 750 sq ft; above that, a share in proportion to the main home. |
| Park land in-lieu fee | Based on land value: $160 to $210 per sq ft of land at low density[6][7] The page does not say how this applies to ADUs. State law bars it under 750 sq ft. |
| School fees | Mountain View Whisman $3.45, Los Altos SD $3.58, MVLA high school $1.72 per sq ft[8][1][9][10][11] For 500 sq ft or more. You pay the districts directly and show the receipt before the permit is issued. MVLA rises to $1.79 on Nov 13, 2026. |
| Water capacity fee (City of Mountain View) | $9,389.06 per single-family detached unit[6][7][1] No ADU line. State law limits capacity charges to a share based on the ADU's size or plumbing fixtures. Conversions that fix a code or zoning problem pay none unless new utility work is needed. |
| Sewer capacity fee (City of Mountain View) | $7,922.69 per single-family detached unit[6][7] No ADU line. The same state proportionality rule applies. |
The last survey of what Bay Area owners actually paid is from UC Berkeley in 2021: a median of $329 per sq ft for ADUs permitted in 2018 and 2019.[2] Construction prices in California have risen about 60% since then by the state's own cost index (2018-2019 average 6,719 to September 2026: 10,717).[3] We check that against two current numbers and use the spread as the range.
Smaller units cost more per foot. We scale by size the way Abodu's own price list does. The survey counted design and permits in its figure, so a little of the city fee may overlap.
Abodu published all-in prices (home + typical installation).[5]
Not included: Survey package ($6,000), trenching past 50 ft, crane past 100 ft, demolition, site engineering and sales tax.
None of these pages cites where its number comes from.
For a 750 sq ft detached ADU, our estimate is $350,000 to $465,000 to build. School and utility fees can add more.[1][2][3][4]
The city doesn't publish a total. $7,000 to $13,000 in building permit fees, including inspections The fee lines on this page list each charge.[1]
No. State law bars impact fees on ADUs under 750 sq ft. Larger ADUs pay in proportion to the main home. School fees follow a different rule, and districts disagree about it, so ask yours.[7]
Every fact on this page links to one of these. We read each one on the date shown.