Two numbers, kept apart. City fees come from the city's own fee pages. The build price is our estimate from the last owner survey and today's published prices. How we got it

Official City fees

$5,322

Base permit fee, new ADU 601 to 800 sq ft. [1][2]

Our estimate Building it

$350k–465k

750 sq ft detached, design and construction. Middle of the range: $405k.[3][4][5][6]

All in, before school and utility fees: about $355k to $470k for a 750 sq ft detached ADU. Adjust it for your lot

8 licensed builders list Redwood City on their own sites. Your quote request goes to the Bay Area ADU Builders team.

Get 3 quotes

Estimate your ADU

Change the type and size. City fees come from Redwood City's own averages; the building cost is our estimate.

Type
School districts
Building it (our estimate)
—
City permit fees (city average)
—
School fees (rate × the whole ADU once it's over 500 sq ft, capped at $5.38)
—
Likely total
—

Building (middle) City fees School fees

Not included: water and sewer connection, and site surprises like a long utility run or a crane. See the fee list below.

Get 3 quotes to check this number

Licensed builders who list Redwood City

All 8

The top three by our public score for Redwood City. Some publish prices, which is the quickest check on the estimate above.

Every fee Redwood City can charge

Base permit fee, new ADU $3,999.53 up to 400 sq ft or a garage conversion; $4,660.62 for 401 to 600 sq ft; $5,321.71 for 601 to 800 sq ft[1][2] Valuation-based fees are added case by case.
Transportation, park and housing impact fees $0 for ADUs[1][7][8][2] A council resolution exempts ADUs from these three fees until April 1, 2027. The ADU page also says no impact fees under 750 sq ft.
School fees $5.17 per sq ft, split between Sequoia Union HSD and your elementary district[7][9][10] For 500 sq ft or more of living space. You write two checks.
Wastewater collection capacity fee (City of Redwood City) $1.78 per sq ft[1] The wastewater treatment capacity fee does not apply to ADUs.
Water capacity fee (City of Redwood City) $3.19 per sq ft[1][7] The city says water and sewer capacity fees apply to ADUs.
Address for the ADU $376[1]

How we estimate the building cost

The last survey of what Bay Area owners actually paid is from UC Berkeley in 2021: a median of $329 per sq ft for ADUs permitted in 2018 and 2019.[3] Construction prices in California have risen about 60% since then by the state's own cost index (2018-2019 average 6,719 to September 2026: 10,717).[4] We check that against two current numbers and use the spread as the range.

  • UC Berkeley 2021 owner survey, Bay Area median for ADUs built 2018-19 ($329 per sq ft), raised by the California Construction Cost Index (x1.595)[3][4] $525/sq ft
  • San Mateo County ADU Resource Center rule of thumb for design, construction and fees[5] $450 to 600/sq ft
  • Abodu published all-in price, 800 sq ft 2 bed / 2 bath ($424,800)[6] $531/sq ft

Other ADU types

  • Attached ADU: Detached band scaled by the survey's addition-to-detached ratio ($250 vs $300 per sq ft statewide)[3] $375 to 500/sq ft
  • Garage conversion: UC Berkeley 2021 owner survey, statewide median for garage ADUs ($189 per sq ft), raised by the California Construction Cost Index[3][4] $302/sq ft
  • Garage conversion: Same, with the survey's Bay Area premium over the statewide median (x1.32)[3][4] $397/sq ft
  • Garage conversion: SYMBiHOM published garage conversion price, $150K to $225K (per sq ft at a 400 sq ft two-car garage)[11] $375 to 560/sq ft
  • Junior ADU: UC Berkeley 2021 owner survey, statewide median for converting part of the main home ($173 per sq ft), raised by the California Construction Cost Index[3][4] $276/sq ft
  • Junior ADU: Same, with the survey's Bay Area premium (x1.32)[3][4] $363/sq ft

Smaller units cost more per foot. We scale by size the way Abodu's own price list does. The survey counted design and permits in its figure, so a little of the city fee may overlap.

Prefab prices you can check

Abodu published all-in prices (home + typical installation).[6]

  • Studio, 385 sq ft$298,800
  • 1 bed, 500 sq ft$324,800
  • 2 bed / 1 bath, 625 sq ft$358,800
  • 2 bed / 2 bath, 800 sq ft$424,800
  • 3 bed / 2 bath, 1,070 sq ft$464,800
  • 3 bed / 3 bath, 1,195 sq ft$498,800

Not included: Survey package ($6,000), trenching past 50 ft, crane past 100 ft, demolition, site engineering and sales tax.

What other sites say

  • 9Builders: $150,000 to $350,000 in San Jose[12]
  • IMKAT Homes: $205,000 to $415,000 by size[13]
  • ADU Builders Group: $450 to $475 per sq ft[14]
  • SYMBiHOM: $250,000 to $500,000 for a 500 to 1,200 sq ft backyard ADU[11]

None of these pages cites where its number comes from.

Common questions

How much does it cost to build an ADU in Redwood City?

For a 750 sq ft detached ADU, our estimate is $350,000 to $465,000 to build, plus about $5,322 in city fees by the city's own numbers. School and utility fees can add more.[1][2][3][4][5]

What are the ADU permit fees in Redwood City?

The city's own estimate is $5,322 (base permit fee, new adu 601 to 800 sq ft). School and utility fees are separate.[1][2]

Do ADUs under 750 sq ft pay impact fees?

No. State law bars impact fees on ADUs under 750 sq ft. Larger ADUs pay in proportion to the main home. School fees follow a different rule, and districts disagree about it, so ask yours.[15]

Is a garage conversion cheaper than a new ADU?

Usually. In the 2021 UC Berkeley survey, garage ADUs had a median cost of $90,000 statewide against $180,000 for detached ones. Raised to 2026 prices, a 400 sq ft garage conversion lands around $120k to $225k by our estimate.[3][4][11]

Sources

Every fact on this page links to one of these. We read each one on the date shown.

  1. 1. City of Redwood City Master Fee Schedule FY2026-27 (effective July 1, 2026): New ADU base fees $3,999.53 / $4,660.62 / $5,321.71 Checked Oct 18, 2026
  2. 2. City of Redwood City ADU page: base fee estimates $3,999.53 (0-400 sq ft or garage conversion), $4,660.62 (401-600), $5,321.71 (601 Checked Oct 18, 2026
  3. 3. UC Berkeley Center for Community Innovation Statewide median $150,000/$250sf Checked Oct 18, 2026 read from an archived copy of this official page
  4. 4. California Department of General Services California Construction Cost Index (ENR BCI average of San Francisco and Los Angeles) Checked Oct 18, 2026
  5. 5. San Mateo County ADU Resource Center $450-$600/sf all-in placeholder Checked Oct 18, 2026
  6. 6. Abodu Home From $234,800 Checked Oct 18, 2026
  7. 7. City of Redwood City Development Impact Fees sheet, updated July 2026: parks fee ADU $0/sq ft Checked Oct 18, 2026
  8. 8. City of Redwood City 2026 park impact fees: single family $48,601.86/unit Checked Oct 18, 2026
  9. 9. Sequoia Union HSD 60/40 split Checked Oct 18, 2026
  10. 10. Sequoia Union HSD Per-feeder rates incl Checked Oct 18, 2026
  11. 11. SYMBiHOM Garage conversion $150K-$225K Checked Oct 18, 2026
  12. 12. 9Builders FAQ: SJ ADU $150k-$350k, rents $1,800-$3,000/mo, unsourced Checked Oct 18, 2026
  13. 13. IMKAT Size-tier cost table $205k-$415k, unsourced Checked Oct 18, 2026
  14. 14. ADU Builders Group $450-$475/sq ft Checked Oct 18, 2026
  15. 15. California Department of Housing and Community Development (HCD) All state ADU/JADU rules used in state_baseline.md (sizes, heights, setbacks, parking, owner-occupancy, JADU, Checked Oct 18, 2026