Acton ADU
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
- Detached
- Ready-made plans
- Lists Los Altos on its own site
- No public complaints on its CSLB record
- Publishes general price ranges
Two numbers, kept apart. City fees come from the city's own fee pages. The build price is our estimate from the last owner survey and today's published prices. How we got it
Official City fees
Line by line
$0 for the city ADU building permit, trade permits and plan checkSee every fee [1]
All in, before school and utility fees: about $350k to $465k for a 750 sq ft detached ADU. Adjust it for your lot
11 licensed builders list Los Altos on their own sites. Your quote request goes to the Bay Area ADU Builders team.
Get 3 quotes11 licensed builders list Los Altos on their own sites. Three quotes for your lot show where in the range you land. Your request goes to the Bay Area ADU Builders team.
Get 3 quotesChange the type and size. City fees come from Los Altos's own averages; the building cost is our estimate.
Building (middle) City fees School fees Parkland
Not included: water and sewer connection, and site surprises like a long utility run or a crane. See the fee list below.
Get 3 quotes to check this numberThe top three by our public score for Los Altos. Some publish prices, which is the quickest check on the estimate above.
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
Based in Santa Clara, Santa Clara County
CSLB #889458 active Class B Licensed 19 years
Based in Los Gatos, Santa Clara County
CSLB #1126603 active Class B Licensed 2 years
| ADU building permit, trade permits and plan check | $0[1] The FY 2026-27 schedule lists the ADU building permit, ADU electrical, mechanical or plumbing permit, and ADU plan check at $0.00. |
|---|---|
| Construction tax | $0.42 per sq ft (single family)[1] The schedule does not say whether ADUs pay it. |
| Impact fees | $0 under 750 sq ft; above that, proportional to unit size[6][7] We found no city park or impact fee amounts for ADUs. |
| School fees | Los Altos SD $3.58 per sq ft; MVLA high school $1.72 per sq ft[8][9][6] Only for ADUs over 500 sq ft. MVLA rises to $1.79 on Nov 13, 2026. |
| Water and sewer connection | Not charged as a new residential use (city code)[7][1] The ADU can share the main home's service or have its own meters. The fee schedule lists a $759.16 city sewer permit and a $152.04 tap-in; ask Public Works which apply. |
The last survey of what Bay Area owners actually paid is from UC Berkeley in 2021: a median of $329 per sq ft for ADUs permitted in 2018 and 2019.[2] Construction prices in California have risen about 60% since then by the state's own cost index (2018-2019 average 6,719 to September 2026: 10,717).[3] We check that against two current numbers and use the spread as the range.
Smaller units cost more per foot. We scale by size the way Abodu's own price list does. The survey counted design and permits in its figure, so a little of the city fee may overlap.
Abodu published all-in prices (home + typical installation).[5]
Not included: Survey package ($6,000), trenching past 50 ft, crane past 100 ft, demolition, site engineering and sales tax.
None of these pages cites where its number comes from.
For a 750 sq ft detached ADU, our estimate is $350,000 to $465,000 to build. School and utility fees can add more.[1][2][3][4]
The city doesn't publish a total. $0 for the city ADU building permit, trade permits and plan check The fee lines on this page list each charge.[1]
No. State law bars impact fees on ADUs under 750 sq ft. Larger ADUs pay in proportion to the main home. School fees follow a different rule, and districts disagree about it, so ask yours.[6]
Every fact on this page links to one of these. We read each one on the date shown.