Two numbers, kept apart. City fees come from the city's own fee pages. The build price is our estimate from the last owner survey and today's published prices. How we got it
Official City fees
Line by line
The city doesn't publish a total for an ADU, so we list each charge.See every fee [1]
All in, before school and utility fees: about $350k to $465k for a 750 sq ft detached ADU. Adjust it for your lot
9 licensed builders list Campbell on their own sites. Your quote request goes to the Bay Area ADU Builders team.
Get 3 quotes9 licensed builders list Campbell on their own sites. Three quotes for your lot show where in the range you land. Your request goes to the Bay Area ADU Builders team.
Get 3 quotesChange the type and size. City fees come from Campbell's own averages; the building cost is our estimate.
Building (middle) City fees School fees Parkland
Not included: water and sewer connection, and site surprises like a long utility run or a crane. See the fee list below.
Get 3 quotes to check this numberThe top three by our public score for Campbell. Some publish prices, which is the quickest check on the estimate above.
Based in Campbell, Santa Clara County
CSLB #638333 active Class B Licensed 34 years
Based in Santa Clara, Santa Clara County
CSLB #889458 active Class B Licensed 19 years
Based in Los Gatos, Santa Clara County
CSLB #1126603 active Class B Licensed 2 years
| Building permit, by valuation | 2.00% of the first $500,000 of valuation ($237 minimum)[1] Plan check adds 33% of the permit fee. Fire plan check adds $119 or 10%, whichever is greater. FY 2027 schedule, effective July 1, 2026. |
|---|---|
| Valuation and size add-ons | General Plan 0.16%, technology 0.04%, training 0.02% and roadway 0.32% of valuation, plus $0.50 per sq ft construction license tax[1] |
| Planning plan check | $259 detached; $517 attached; $647 conversion[1] |
| Park in-lieu fee | $0 under 750 sq ft; up to $9,328 at 750 sq ft and up; $0 for a JADU[1] Figured under state law and capped at that amount. A new single-family home pays $33,025. |
| School fees | $1.61 to $3.79 per sq ft by district[6][7][8][9] Campbell Union SD charges $3.79 and Campbell Union HSD $1.61. Parts of the city may be in Moreland or Cambrian districts instead. Ask your districts before you budget. |
| Sewer connection (West Valley Sanitation District) | $6,727 max connection + $1,024 max treatment plant capacity[10] Smaller ADUs pay $511.16 and $73.53 per drainage fixture unit. The district's fee tables are labeled FY2018/19 to FY2020/21. |
The last survey of what Bay Area owners actually paid is from UC Berkeley in 2021: a median of $329 per sq ft for ADUs permitted in 2018 and 2019.[2] Construction prices in California have risen about 60% since then by the state's own cost index (2018-2019 average 6,719 to September 2026: 10,717).[3] We check that against two current numbers and use the spread as the range.
Smaller units cost more per foot. We scale by size the way Abodu's own price list does. The survey counted design and permits in its figure, so a little of the city fee may overlap.
Abodu published all-in prices (home + typical installation).[5]
Not included: Survey package ($6,000), trenching past 50 ft, crane past 100 ft, demolition, site engineering and sales tax.
None of these pages cites where its number comes from.
For a 750 sq ft detached ADU, our estimate is $350,000 to $465,000 to build. School and utility fees can add more.[1][2][3][4]
The city doesn't publish a total. No published total; see fee lines The fee lines on this page list each charge.[1]
No. State law bars impact fees on ADUs under 750 sq ft. Larger ADUs pay in proportion to the main home. School fees follow a different rule, and districts disagree about it, so ask yours.[15]